[{"slug":"20200811-aare-baustelle-sbb-brucke-koblenz","node_locale":"en","createdAt":"2023-11-23T09:40:45Z","updatedAt":"2024-03-17T17:46:45Z","name":"Restriction of navigation on the Aare between the Klingnau power station and the mouth of the Rhine","description":{"raw":"{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"SBB AG is repairing its Aare bridge between Koblenz and Felsenau. The construction work will continue from the beginning of June 2020 and last until autumn 2022. During this time, river travel in both directions is only possible under difficult conditions. Restrictions will be signalled and must be observed.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"In principle, a lane will be kept open on the Koblenz side, between the bank and the first pier. The passage opening and lane width may change depending on the status of the works. The river signalling will be adapted to the status of the works and is subject to change.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"River travel will be restricted between the power station and the mouth of the Rhine as follows until autumn 2022:\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Monday to Friday, 06.00-18.00 (daytime): passage only possible after registration the day before with the construction management, Tel. 079 600 00 62 (Mr. Merz) or Tel. 079 600 00 79 (Mr. Metzger).\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Saturday and Sunday, 06.00-18.00 (daytime): Passage permitted with special care at own risk.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Monday to Sunday, 18.00-06.00 (at night): Passage prohibited!\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"}],\"nodeType\":\"unordered-list\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Information boards pointing out the restrictions are placed at the following locations:\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Upstream: Klingnau power station crossing point (Coord 2'659'000 / 1'271'710)\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Downstream left bank of the Aare, 500m below the bridge (Coord 2'658'860 / 1'272'790)\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Downstream right bank of the Aare, 600m below the bridge (Coord 2'659'020 / 1'272'760)\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"}],\"nodeType\":\"unordered-list\"}],\"nodeType\":\"document\"}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.22577714920044,47.594819486167545],[8.22502613067627,47.59558641133337],[8.22451114654541,47.5958613440331],[8.222107887268066,47.597163637193844],[8.222043514251709,47.59918936213052],[8.223545551300049,47.60364568092053],[8.22378158569336,47.60444141218848],[8.224296569824219,47.60509245604086],[8.22253704071045,47.60668386245679],[8.221635818481445,47.603920571272475],[8.220176696777344,47.600303477415146],[8.219940662384033,47.60017325737256],[8.219339847564697,47.599102546956125],[8.21976900100708,47.598726346202454],[8.219854831695557,47.59781477161959],[8.219361305236816,47.597829241181444],[8.218803405761717,47.597568788455554],[8.219125270843506,47.596830832024835],[8.221206665039063,47.59507995257869],[8.223416805267334,47.59347372238927],[8.22577714920044,47.594819486167545]]]}"}},"startDate":"2020-07-01","endDate":"2022-10-31","waterway":[{"slug":"alte-aare-3270-bern"},{"slug":"rhein"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"20210813-kraftwerk-bremgarten-zufikon-kiesumlagerungen-reuss-2021","node_locale":"en","createdAt":"2023-11-23T09:40:47Z","updatedAt":"2023-11-23T15:51:38Z","name":"Bremgarten-Zufikon Power Plant - Reuss Gravel Relocations 2021","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"With the decision of the cantonal government (RRB) of 3 December 2014, AEW Energie AG was obliged to rehabilitate the bedload balance at the Bremgarten-Zufikon power plant (KWBZ) in accordance with Art. 43a of the Water Protection Act. To this end, AEW has drawn up a project in close cooperation with the canton of Aargau, which provides for bedload to be removed from the power plant's dam root and returned to the Reuss in the tailwater. The root of the dam begins approximately at the inlet of the Jonen stream in the municipality of the same name. The municipality of Rottenschwil is also directly affected by the bedload removal. The fill is deposited in the municipality of Bremgarten below the Honegger weir, where gravel was already added by the canton in the past.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The bedload transfer will take place between the beginning of September and the end of October.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The following restrictions are to be expected during the work:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Bedload removal in Jonen:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"unordered-list\",\"content\":[{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Access to the Reuss bank on the Jonen side is restricted. Diversion of hiking and cycling trails. Please follow the diversion signs.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}},{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"In agreement with the municipalities of Jonen, Rottenschwil, Oberlunkhofen, Unterlunkhofen and the Canton of Aargau, Werdstrasse from the entrance to Zugerstrasse up to and including the bridge will be closed to individual traffic during the periods with significant transport movements, i.e. Mon-Fri between approx. 7:30 am and 5:30 pm. Use by agricultural traffic is permitted throughout. Transport vehicles will be assisted by a traffic service when entering the Zugerstrasse.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}},{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"On the Reuss, from approx. 200 m above the bedload discharge point to the Werd bridge, river traffic in both directions will only be possible on one side and under difficult conditions during the construction work. The construction site is marked with appropriate navigation signals. The signposting must be observed.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Gravel fill in Bremgarten:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"unordered-list\",\"content\":[{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The accessibility of the forest path between the turn-off to the sewage treatment plant and the filling site is restricted for path users.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}},{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"On the Reuss, in the area of the dumping site, river travel in both directions is only possible on one side and under difficult conditions during the construction work. The construction site is marked with appropriate navigation signals. The signals must be observed.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The relevant truck movements are limited to the following periods:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"unordered-list\",\"content\":[{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"During the school holidays (04.10.21 to 15.10.21): Mon - Fri from 7:30 a.m. to 5:30 p.m.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}},{\"nodeType\":\"list-item\",\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Outside the holiday period (27.09.21 to 01.10.21): Mon - Fri from 8:30 a.m. to 5:30 p.m.\",\"marks\":[],\"data\":{}}],\"data\":{}}],\"data\":{}}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.375734090805054,47.304771148176236],[8.37605595588684,47.30596426871049],[8.376195430755613,47.306546268954946],[8.375262022018433,47.306589918714955],[8.374865055084229,47.30485117539607],[8.375734090805054,47.304771148176236]]]}"}},"startDate":"2021-09-01","endDate":"2021-10-31","waterway":[{"slug":"reuss"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"bauarbeiten-an-der-reussbruecke-zwischen-birmenstorf-und-muelligen","node_locale":"en","createdAt":"2025-05-26T17:53:23Z","updatedAt":"2025-05-26T17:53:23Z","name":"Construction Work on the Reuss Bridge between Birmenstorf and Mülligen","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"data\":{},\"content\":[{\"nodeType\":\"text\",\"value\":\"The Department of Construction, Transport and Environment of the Canton of Aargau is repairing the Reuss Bridge between Birmenstorf and Mülligen. For the construction work, scaffolding will be installed along the entire length of the bridge and on the river piers. This will restrict the clearance height and width. Restrictions on navigation on the Reuss River are to be expected throughout the entire construction period, from June 24, 2025, to spring 2026.\",\"marks\":[],\"data\":{}}]},{\"nodeType\":\"paragraph\",\"data\":{},\"content\":[{\"nodeType\":\"text\",\"value\":\"Navigation will generally be guaranteed. The construction site is marked with navigation signals; the signs must be followed.\",\"marks\":[],\"data\":{}}]}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.245183282322671,47.45897449822144],[8.244994806813366,47.45852052092374],[8.245379610979342,47.45843822052316],[8.24556808648859,47.45889219853356],[8.245183282322671,47.45897449822144]]]}"}},"startDate":"2025-06-24","endDate":"2026-06-24","waterway":[{"slug":"reuss"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"bauarbeiten-bruecke-mellingen","node_locale":"en","createdAt":"2026-03-06T09:54:06Z","updatedAt":"2026-03-08T07:33:13Z","name":"Bridge Mellingen Under Construction","description":{"raw":"{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"The old Reuss Bridge in Mellingen, which borders directly on the old town, is in poor condition and will be repaired from Monday, March 9, 2026, until spring 2027. Restrictions on the Reuss are to be expected during this time:\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"The passage width is restricted\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"},{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"The passage areas vary depending on the construction phase\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"list-item\"}],\"nodeType\":\"unordered-list\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Passage will generally be guaranteed. The construction site is marked with navigation signals, which must be obeyed.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"document\"}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.274008708407678,47.419388154531276],[8.273599463847631,47.41907867060658],[8.273796864164211,47.41894184555258],[8.27419166480044,47.41873334954607],[8.274528689733728,47.419013515868045],[8.274008708407678,47.419388154531276]]]}"}},"startDate":"2026-03-09","endDate":"2027-06-01","waterway":[{"slug":"reuss"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"baustelle-auf-dem-rhein-im-uferbereich-der-solitude-promenade","node_locale":"en","createdAt":"2024-02-20T10:45:52Z","updatedAt":"2024-02-22T11:43:27Z","name":"Buidling Site on the Rhein near Solitude Promenade","description":{"raw":"{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"There is currently a construction site on the Rhine on the banks of the Solitude promenade (at Solitude-Promenade 18). There is a pontoon on the Rhine which is attached to the bank on both sides with steel cables.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Despite signalling, there have already been several cases of canoeists not keeping a sufficient distance from the pontoon and the associated steel cables. This is because the steel cables can be a potential source of danger for water sports enthusiasts.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"The pontoon and the bank areas in front of and behind the pontoon must be avoided as far as possible. An additional danger notice will also be posted on site.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Further information is available at \",\"nodeType\":\"text\"},{\"data\":{\"uri\":\"https://www.rheinpromenade-kleinbasel.ch/themen/gestaltung-rheinufer/\"},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"https://www.rheinpromenade-kleinbasel.ch/themen/gestaltung-rheinufer/\",\"nodeType\":\"text\"}],\"nodeType\":\"hyperlink\"},{\"data\":{},\"marks\":[],\"value\":\"\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"document\"}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[7.607710653279213,47.55770116105637],[7.607781235555734,47.55744598759358],[7.609344128820538,47.557697758751885],[7.609248338588429,47.557997160716724],[7.607710653279213,47.55770116105637]]]}"}},"startDate":"2024-01-15","endDate":"2024-04-30","waterway":[{"slug":"rhein"}],"spot":[{"slug":"basel-museum-tinguely"}],"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"baustelle-balmbrucke-liechtenenstrasse","node_locale":"en","createdAt":"2023-11-23T09:40:50Z","updatedAt":"2023-11-23T15:51:38Z","name":"Building Site at Balm Bridge (Liechtenenstrasse)","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Passage possible with caution.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"If necessary, take a brief look on the outward journey.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"approx. 3km after entry, 2nd bridge in Meiringen\",\"marks\":[],\"data\":{}}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.170759677886963,46.72762264863477],[8.170531690120697,46.72746637022483],[8.170797228813171,46.72730641420697],[8.171027898788452,46.72747740165685],[8.170759677886963,46.72762264863477]]]}"}},"startDate":"2022-07-05","endDate":"2022-07-31","waterway":[{"slug":"alte-aare-3270-bern"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"baustelle-neue-radwegbrucke-attinghausen","node_locale":"en","createdAt":"2023-11-23T09:40:53Z","updatedAt":"2023-11-23T15:51:56Z","name":"Construction Of New Cycle Path Bridge in Attinghausen","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"A new cycle path bridge over the Reuss is being constructed in Attinghausen. Expect construction activity on and near the river this area.\",\"marks\":[],\"data\":{}}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.632609455659264,46.863989004515844],[8.632149941846961,46.86384088873692],[8.6323271828891,46.863585051429396],[8.632648842557273,46.86332472449595],[8.633023018089489,46.863508748838],[8.632609455659264,46.863989004515844]]]}"}},"startDate":"2022-10-10","endDate":"2023-05-31","waterway":[{"slug":"reuss"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"birs-sperrung-bei-baustelle-schlossbruecke-zwingen-bis-ende-nov-2024","node_locale":"en","createdAt":"2024-09-05T14:30:05Z","updatedAt":"2024-09-05T14:30:05Z","name":"Birs: Closure for Construction at Schlossbrücke Zwingen until the end of Nov 2024","description":{"raw":"{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"In Zwingen the Schlossbrücke over the Birs will be renovated from August to November (\",\"nodeType\":\"text\"},{\"data\":{\"uri\":\"https://www.zwingen.ch/aktuellesinformationen/2193772\"},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"https://www.zwingen.ch/aktuellesinformationen/2193772\",\"nodeType\":\"text\"}],\"nodeType\":\"hyperlink\"},{\"data\":{},\"marks\":[],\"value\":\" ). The construction site area is closed to all traffic and the Birs is closed to swimming.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Swiss Canoe have asked the project management to put up appropriate information on the river so that paddlers can land in good time. Please be careful when navigating the river and leave it before the construction site, even if the necessary signs are not yet in place.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"document\"}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[7.52781430942764,47.43774576378857],[7.527881917161608,47.43764802862313],[7.527948199253558,47.43748125076493],[7.527940245401851,47.43738710174074],[7.527915058207128,47.43736558194047],[7.5281178814081215,47.43738082513315],[7.5280754608696725,47.43744807446177],[7.5280595531678784,47.43751980698346],[7.528072809585751,47.43753594678773],[7.528066181376772,47.43763637212348],[7.5279694095223135,47.43778162985927],[7.52781430942764,47.43774576378857]]]}"}},"startDate":"2024-08-05","endDate":"2024-11-30","waterway":[{"slug":"birse"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"durchfuehrung-von-geschiebetransport-versuch-aare-aareggbruecke","node_locale":"en","createdAt":"2025-01-28T17:39:14Z","updatedAt":"2025-01-28T17:39:14Z","name":"Bedload Transport Experiments in the Aare near the Aaregg Bridge","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"data\":{},\"content\":[{\"nodeType\":\"text\",\"value\":\"A bedload transport test is being carried out at the Aaregg Bridge (bridge at the exit). Signs are being put up to indicate that the passage width is limited and that special caution is required.\",\"marks\":[],\"data\":{}}]}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.052388672668599,46.742543713643386],[8.052370122422872,46.742747071138496],[8.049588068983326,46.74266656896364],[8.049594257863504,46.74245473801483],[8.052388672668599,46.742543713643386]]]}"}},"startDate":"2025-01-31","endDate":"2025-04-30","waterway":[{"slug":"aare"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"einschraenkungen-der-schifffahrt-bis-ende-oktober-2023-auf-der-reuss-wegen-kiesumlagerungen","node_locale":"en","createdAt":"2023-11-23T09:40:57Z","updatedAt":"2023-11-23T15:51:56Z","name":"Reuss Jonen to Bremgarten: Restrictions on shipping until the end of October 2023 on the Reuss due to gravel transfers","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Restriction of shipping due to the removal of bedload at Jonen:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"On the Reuss, from approx. 200 m above the sediment collection point at the confluence of the Jonen stream to the Werd bridge, river travel in both directions is only possible on one side and under difficult conditions during the construction work. The construction site is marked with appropriate shipping signals. The signalling must be observed.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Restriction of shipping due to gravel filling in Bremgarten below the Honegger weir:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"On the Reuss, in the area of ​​the dumping site, river travel in both directions is only possible on one side and under difficult conditions during the construction work. The construction site is marked with appropriate shipping signals. The signalling must be observed.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"For detailed information see: \",\"marks\":[],\"data\":{}},{\"nodeType\":\"hyperlink\",\"data\":{\"uri\":\"https://amtsblatt.ag.ch/ekab/00.041.120/publikation/\"},\"content\":[{\"nodeType\":\"text\",\"value\":\"https://amtsblatt.ag.ch/ekab/00.041.120/publikation/\",\"marks\":[],\"data\":{}}]}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.374887795388219,47.3047924623657],[8.37464058225811,47.30377804731299],[8.374558177882392,47.303090297221985],[8.374577194276469,47.3029398506971],[8.375439270831691,47.30293125373967],[8.375432932033362,47.303038715604515],[8.375547030400895,47.30409612870403],[8.375718177952649,47.30470219740823],[8.374887795388219,47.3047924623657]]]}"}},"startDate":"2023-09-06","endDate":"2023-10-31","waterway":[{"slug":"reuss"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"einschrankung-schifffahrt-limmat-baderquartier-baden","node_locale":"en","createdAt":"2023-11-23T09:40:49Z","updatedAt":"2023-11-23T15:51:38Z","name":"Restriction of navigation on the Limmat near the Bäderquartier in Baden","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The Merciersteg in the Baden bathing district is being repaired by the city of Baden, the municipality of Ennetbaden and the Abwasserverband Region Baden Wettingen.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The measures also include corrosion protection work on the steel structure. The repairs will be carried out with a rolling scaffold of limited length so that the passage of boats is always possible.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The construction work will last from the beginning of June 2022 to the beginning of August 2022. The rolling scaffold will be marked with navigation signals; the signposting must be observed.\",\"marks\":[],\"data\":{}}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.314222991466522,47.48034406218074],[8.314182758331299,47.48026430101228],[8.314122408628464,47.480207199192314],[8.314526081085205,47.47999691893925],[8.314668238162994,47.48013106333582],[8.314222991466522,47.48034406218074]]]}"}},"startDate":"2022-06-01","endDate":"2022-08-01","waterway":[{"slug":"limmat"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"kraftwerk-bremgarten-zufikon-kiesumlagerungen-reuss-2025","node_locale":"en","createdAt":"2025-09-07T14:18:24Z","updatedAt":"2025-09-07T14:18:24Z","name":"Bremgarten-Zufikon Power Plant (AEW Energie AG) - Gravel Relocations Reuss 2025","description":{"raw":"{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Engineering works will take place on the Ruess river around the Bremgarten-Zufikon dam.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"Please see official notice from Kanton Aargau for full details: \",\"nodeType\":\"text\"},{\"data\":{\"uri\":\"https://amtsblatt.ag.ch/ekab/00.078.378/publikation/\"},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"https://amtsblatt.ag.ch/ekab/00.078.378/publikation/\",\"nodeType\":\"text\"}],\"nodeType\":\"hyperlink\"},{\"data\":{},\"marks\":[],\"value\":\"\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"document\"}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[8.345288794427802,47.3447753671073],[8.345392710415979,47.34412941023078],[8.345415300848941,47.34376509931192],[8.34572704881478,47.34376203786471],[8.345740603073978,47.343403847346565],[8.345071926277797,47.34340997028187],[8.344990600721133,47.34278236572359],[8.346382171353298,47.34254050636551],[8.346689401233704,47.34309769967811],[8.346707473578363,47.34340997028187],[8.346449942650707,47.34341609321649],[8.346404761784811,47.344303911208755],[8.346422834130863,47.34454576248794],[8.346373135179505,47.344836594837346],[8.345288794427802,47.3447753671073]]]}"}},"startDate":"2025-09-01","endDate":"2025-10-19","waterway":[{"slug":"reuss"}],"spot":[{"slug":"laufkraftwerk-zufikon-flussaufwerts-ausfahrt"},{"slug":"laufkraftwerk-zufikon-flussabwaerts-einfahrt"}],"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"rabloch-bis-auf-weiteres-gesperrt","node_locale":"en","createdAt":"2023-11-23T09:40:52Z","updatedAt":"2023-11-23T15:51:37Z","name":"Räbloch closed for safety reasons until further notice closed","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Since the floods of Monday, 04 July 2022, the Räbloch has been blocked up with floating wood and tree trunks. Based on observations and findings from a flyover, it is NOT possible to climb over the wood. Also the passage with a canoe or rubber dinghy is currently NOT possible!\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"The Räbloch is therefore closed for safety reasons until further notice. A final assessment of the situation and a decision on further necessary measures will only be possible as soon as the actual extent of the damage has been assessed on site.\",\"marks\":[],\"data\":{}}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[7.828692197799683,46.82688179832563],[7.828922867774964,46.82647989221435],[7.82913476228714,46.826445023505954],[7.828920185565948,46.826856105787435],[7.828692197799683,46.82688179832563]]]}"}},"startDate":"2022-07-06","endDate":"2025-12-31","waterway":[{"slug":"kleine-emme"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"renaturierung-des-rechten-aareufers-zwischen-bern-seftausteg-und-neubruecke","node_locale":"en","createdAt":"2025-05-26T17:53:24Z","updatedAt":"2025-05-26T18:04:39Z","name":"Renaturalisation of the Right Bank of the Aare between Bern Seftausteg and Neubrücke","description":{"raw":"{\"data\":{},\"content\":[{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"The right bank of the Aare from Bern Seftausteg to the Neubrücke bridge has been renaturalized. A few small hazards have been incorporated, particularly at the beginning of the stretch, which could be problematic for inexperienced canoeists or swimmers. In the Bremgarten community's neighborhood newsletter No. 5/2025, there is a very good article on page 10 with a detailed description of the hazards.The right bank of the Aare River from Bern Seftausteg to the Neubrücke bridge has been renaturalized. A few minor hazards have been incorporated, particularly at the beginning of the stretch, which could be problematic for inexperienced canoeists or swimmers. The Bremgarten community's neighborhood newsletter No. 5/2025 contains a very good article with a detailed description of the hazards on page 14.\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"},{\"data\":{},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"This neighborhood newsletter No. 5 should be available soon on the following website, when it is published: \",\"nodeType\":\"text\"},{\"data\":{\"uri\":\"https://www.digibern.ch/katalog/dr-wecker\"},\"content\":[{\"data\":{},\"marks\":[],\"value\":\"https://www.digibern.ch/katalog/dr-wecker\",\"nodeType\":\"text\"}],\"nodeType\":\"hyperlink\"},{\"data\":{},\"marks\":[],\"value\":\"\",\"nodeType\":\"text\"}],\"nodeType\":\"paragraph\"}],\"nodeType\":\"document\"}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[7.438631392784316,46.96946676478814],[7.4379936293617845,46.968972418283784],[7.437112025608229,46.96856030283416],[7.4360863193657565,46.96857952097119],[7.435227122726701,46.969057328343496],[7.434896803461982,46.970123175179225],[7.4344731854119175,46.97145218356724],[7.433621838602619,46.97233471991743],[7.4326438461296505,46.97313269824366],[7.431889190832436,46.97349924114175],[7.431008080265968,46.97383530350399],[7.430167102034005,46.97401348824627],[7.429107590121788,46.97416280672664],[7.428032490948027,46.97414265145869],[7.428115499154671,46.97399785640047],[7.429143187353645,46.973933339614746],[7.430108638897309,46.97383093339616],[7.431377614283235,46.97356729587642],[7.432600018276986,46.97284929127309],[7.4338127808786965,46.97182588975954],[7.434205258800347,46.971383942998784],[7.434459658105226,46.970651422074724],[7.434643702529968,46.97000814662255],[7.4349040477065955,46.969139693000955],[7.435223617602986,46.96867007796857],[7.4356105304449045,46.968472161023584],[7.436248181469296,46.96832644112595],[7.43712193539406,46.96833377652186],[7.438011847768962,46.96867281268925],[7.43881299646111,46.969346638026025],[7.438631392784316,46.96946676478814]]]}"}},"startDate":"2025-05-26","endDate":"2026-05-25","waterway":[{"slug":"aare"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}},{"slug":"sperrung-wegen-ufersanierung-aare-eichholz-dahlholzli","node_locale":"en","createdAt":"2023-11-23T09:40:55Z","updatedAt":"2023-11-23T15:51:57Z","name":"Closure Due to Bank Renovation: Aare Eichholz - Dählhölzli","description":{"raw":"{\"nodeType\":\"document\",\"data\":{},\"content\":[{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"On Monday, 26 September 2022, construction work started on the bank restoration along the Aare in Eichholz and near Dählhölzliwald. The existing bank reinforcements have reached the end of their useful life and the banks are severely undermined in many places. The rehabilitation is necessary to protect the riverside paths and the drinking water and wastewater pipes running along the banks from erosion. The construction work is scheduled to last until April 2023. Boats and swimmers will not be able to pass the construction site during the construction period.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"Access to the construction sites will be via Wabern-Eichholz. The Bernese side of the river will be made accessible by means of a temporary bridge over the Aare. In order to ensure safety along the access road to the construction site, various measures have been laid down. For example, lorries are not allowed to drive before 8.30 a.m. and at midday, when most schoolchildren are on the road, and a speed limit of 20 km/h applies to lorries.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"At the same time as the cantonal project, the municipality of Köniz and the city of Bern are widening their riverside paths in the area. This is to create more space for walkers and to ensure access for maintenance vehicles. The path closures and diversions required for this work, which will last several weeks, will be signalled in good time.\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"text\",\"value\":\"More info:\",\"marks\":[],\"data\":{}}],\"data\":{}},{\"nodeType\":\"paragraph\",\"content\":[{\"nodeType\":\"hyperlink\",\"data\":{\"uri\":\"https://www.aare.bvd.be.ch/de/start/aare-mittelland/daehlhoelzli---eichholz.html\"},\"content\":[{\"nodeType\":\"text\",\"value\":\"https://www.aare.bvd.be.ch/de/start/aare-mittelland/daehlhoelzli---eichholz.html\",\"marks\":[],\"data\":{}}]}],\"data\":{}}]}"},"affectedArea":{"internal":{"content":"{\"type\":\"Polygon\",\"coordinates\":[[[7.460837430012958,46.93411159797134],[7.460849474624666,46.93411122932943],[7.460534976899737,46.93437966777515],[7.45990598145201,46.93475547933903],[7.458792135346101,46.9350507580036],[7.457874850318035,46.935104444858354],[7.456878940858218,46.93497022761983],[7.455647158106302,46.934487042777135],[7.453930524696233,46.93373541324439],[7.452685637871468,46.933288009704],[7.452122162782615,46.93271532771877],[7.452698741943237,46.93284060242655],[7.453760171761957,46.93314483978236],[7.455149203376379,46.9338159454843],[7.455289432933768,46.9337363854204],[7.455401600396499,46.933819702473585],[7.455563346654401,46.93380392429327],[7.455938829040662,46.93391831599516],[7.4561756717763785,46.934131320583276],[7.45663202729159,46.93434037981757],[7.4571230427192745,46.93451393780728],[7.457718037884121,46.934651994897536],[7.458492109264029,46.93464016144668],[7.458688515435284,46.93459282761634],[7.4595261299888875,46.93437193585743],[7.460080688589244,46.93406820820081],[7.46053126745241,46.93357514015523],[7.460837430012958,46.93411159797134]]]}"}},"startDate":"2022-09-26","endDate":"2023-04-30","waterway":[{"slug":"alte-aare-3270-bern"}],"spot":null,"dataSourceType":{"slug":"swiss-canoe-meldestelle-fur-absehbare-gewasserereignisse"},"dataLicenseType":{"slug":"cc-by-sa-4"}}]